I-95 Express Toll Lanes Project Awards
- 2011 National Partnership for Highway Quality (NPHQ ) Achievement Award
- 2010 NPHQ Make a Difference Silver Award for Public Communications
- 2010 Maryland Quality Initiative (MdQI) Structure – New/Rehab over $5 Million
- 2010 MdQI Subcontractor – High Steel Structures, Inc.
- 2010 MdQI Partnering Silver Award
- 2010 American Concrete Institute (ACI) for Heavy Construction
- 2009 Maryland Asphalt Association, Inc. Quality Pavement Award
- 2009 MdQI Partnering Award
- 2009 MdQI Consultant Structure Design
- Mid-Atlantic Construction Best of '07 Award of Merit – Bridge
Contractor Information
The Maryland Transportation Authority has advertised a series of contracts to construct the I-95 Express Toll Lanes (ETLs) Project. Construction is proceeding with interim improvements to construct “thru” express toll lanes. These interim improvements will require approximately five years to complete. Two additional contracts will be advertised early in 2011. A summary of contracts that have been advertised and those to be advertised as of January 1, 2010 are listed below.
For more information, please call 410-931-0808 to reach representatives of the I-95 Project Team as listed below:
Dave LaBella, MdTA Project Manager
Dave Greenwood, Program Director, GEC Partners
Gradon Tobery, Construction Manager, GEC Partners
I-95 ETLs
Contracts, Ad Dates and |
|||
| |
|||
| Contract | Ad/Status | Cost | |
| Contract No. 1 – KH 720-000-006 Cowenton Avenue and Joppa Road Bridges |
|||
| Removal & replacement of bridges over I-95 | NTP 5/06 J.B. Fay Co. Completed |
$14,018,183 | |
| Paving & drainage improvements to Cowenton Avenue and Joppa Road | |||
| Grading, HMA paving, signing and lighting | |||
| Contract No. 2 – KH 1404-000-006 King Avenue Bridge |
|||
| Removal & replacement of bridge over I-95 |
Deferred | $5,000,001 to $10,000,000 | |
| HMA paving of bridge approaches | |||
| Installation of temporary traffic control signal for MOT | |||
| Grading, HMA paving, signing, lighting, and safety improvements | |||
| Contract No. 3 – KH 1405-000-006 Whitemarsh Run |
|||
| Stream restoration and mitigation | TBD | $2,000,001 to $5,000,000 | |
| Contract No. 4 – KH 1501-000-006 I-895/I-95 NBGP, Moravia Park Dr, Moravia Rd |
|||
| Removal & replacement of bridges over I-95 and new construction of I-895 NB General Purpose lanes from south of Moravia Road to north of the I-95, merge, and new bridge over I-95 | NTP 10/16/06 Cherry Hill Construction, Inc. Completed |
$53,761,900 | |
| Grading, drainage, retaining walls, and safety improvements | |||
| Contract No. 5 – KH 1301-000-006 I-695/I-95 Interchange Lillian Holt Drive and Kenwood Avenue Bridges |
|||
| Construction of new overpass, ramps and mainline bridges over I-695 and the removal of existing I-695 ramps and bridges; project includes replacement of Lillian Holt Bridge over I-695 and Kenwood Avenue Bridge over I-95 | NTP 01/08/07 Wagman/Corman Const./McLean Contr., JV Completed |
$208,601,390 | |
| Grading, HMA paving and drainage improvements to Lillian Holt Avenue and Kenwood Avenue | |||
| Contract No. 6 – KH 1401-000-006 Mainline I-95, Rossville Boulevard to Campbell Boulevard, and Campbell Boulevard Bridge |
|||
Construction of new pavement to |
NTP 08/20/07 American Infrastructure Completed |
$52,477,777 | |
| Grading, drainage, retaining walls, noise barriers, HMA paving, signing, lighting | |||
| Contract No. 7 – KH 1402-000-006 MD 43 Interchange |
|||
| Bridge replacement and ramp modifications | NTP 11/07/11 Fall 2014 Completion |
$100,000,001 to $150,000,000 | |
| Grading, drainage, bridges, HMA paving, signing, signals, lighting, and safety improvements | |||
| Contract No. 8 – KH 1503-000-006 Mainline I-95 South of Chesaco Avenue to Kenwood Avenue and Chesaco & Hazelwood Bridges |
|||
| Construction of new pavement to the outside of existing I-95 and construction of new managed lanes over existing I-95 roadway | NTP 01/14/08 Cherry Hill Completed |
$86,797,429 | |
| Hazelwood Bridge extension | |||
| Grading, drainage, retaining walls, HMA paving, noise barriers, signing, lighting, and safety improvements | |||
| Contract No. 9 – KH 1502-000-006 I-95 and I-895 from the I-895 Interchange to South of Chesaco Avenue |
|||
| Construction of new alignment roadway and bridge over I-95
and bridge over Moores Run |
NTP 09/15/08 Concrete General Completed |
$85,281,193 | |
| Grading, drainage, retaining walls, noise barriers, HMA paving, signing, lighting, and safety improvements | |||
Contract No. 11– KH 1302-000-006 |
|||
| Construction of new mainline bridges for I-95 ETLs including grading, drainage, HMA paving, signing,
lighting, and safety improvements |
NTP 08/15/11 Summer 2013 Completion |
$53,888,000 | |
*NTP = Notice to Proceed