Home    Photo Gallery
Project Overview
Construction Projects
- Overview
- Underway
- I-95/MD 43 Interchange
- I-95/I-695 Managed Lanes (ETLs) Mainline
- I-95 Southbound between I-895 and Eastern Avenue
- Completed
- I-95 from Chesaco Ave. to Hazelwood Ave.
- I-95 and I-895 Mainline Construction
- Rossville Boulevard Bridge Replacement
- Cowenton Avenue and Joppa Road Bridge Replacements
- I-95/I-895 Northbound General-Purpose Lanes Construction
- I-95/I-695 Interchange & Lillian Holt Drive and Kenwood Avenue Bridges
- I-95 from Rossville Blvd. to Campbell Blvd.
   
Driver Information
Residents
Environmental Stewardship
Press Releases / Brochures
Frequently Asked Questions
Stay Informed
Contractors
Frequently Asked Questions
 
  Contact Us
 

I-95 ETLs Project Office
8019 Corporate Drive, Suite F
White Marsh, Maryland 21236
Phone 410-931-0808
Toll-free 1-888-I95-ETLS
Fax 410-931-4110

Comment Online


Local Traveler Information

For more information about the MDTA visit: www.mdtransportationauthority.com

   
Construction Projects  
 
I-95/I-695 Interchange & Lillian Holt Drive and Kenwood Avenue Bridges

The I-95/I-695 interchange, located in Baltimore County, will be totally reconstructed in multiple phases. The project area extends along I-95 from the Kenwood Avenue overpass to south of the Rossville Boulevard overpass, and along I-695 from west of the Lillian Holt Drive overpass to the I-695/Philadelphia Road (MD Route 7) interchange.

The new interchange is necessary in order to realign the existing travel (general-purpose) lanes and to add the new Express Toll LanesSM (ETLsSM) along I-95. During the first phase of construction, a new, reconfigured four-level interchange for general-purpose roadways and ramps was constructed. All new ramps have been completed and opened to traffic. Also, the Kenwood Avenue and Lillian Holt Drive replacement overpass bridges have been completed.

The next phase of construction will start by fall 2011 and include the construction of two ETLs mainline bridges that will carry northbound and southbound ETLs traffic through the I-695 interchange.

Printer friendly fact sheet PDF

View the project photo gallery.

The project area after completion of Phase I. Above: I-95/I-695 prior to Phase I Construction

The project area after completion of Phase I. Above: I-95/I-695 Phase I completed


The first phase of the new I-695/I-95 interchange features:

  • A new four-level general-purpose lane interchange.
  • New overpass bridges for Kenwood Avenue and Lillian Holt Drive.


About Construction

Phase I construction extends 1.3 miles along I-95. The 3½ year project began in January 2007 and was completed in Summer 2010. Construction work included:

  • New Stormwater Management Facilities.
  • Signing, Marking and Interim Intelligent Transportation System (ITS) Improvements.
  • Pavement Milling and Resurfacing.
  • Excavation and Embankments.
  • Full-Depth Pavement Construction.
  • New Storm Drain Improvements.
  • New Retaining Wall Structures.
  • New Sound Barrier Structures.
  • New Bridge Structures.
  • Utility Relocation.
  • Stream Relocation.
  • Landscaping.
  • Lighting.